Write to the desk

GridLink Sourcing reads the brief you send

Use the procurement form to request independent sourcing support for a US inverter purchase. Include a work email for questions about the requirement; a submission does not confirm supplier availability or a reply deadline.

Where correspondence goes

No warehouse, dock or walk-in counter is published. Project papers move through the form so the specification stays attached to the request. Do not mail samples to a guessed address.

Email and phone

No public mailbox or phone number is configured. Use the procurement form and keep the equipment type, quantity and destination together. Do not send payment information or confidential drawings in an initial request.

Review scope

State the requested delivery window and mark unknown ratings explicitly. Review timing and factory lead time require confirmation for the request. This site does not publish office hours or a guaranteed response time.

Illustration of a sourcing desk reviewing inverter drawings, not a street map
Illustration of the review desk. It is not a map pin and not a factory gate.

What happens after you submit

  1. The note is checked for equipment type, rated AC power or an explicit unknown, DC input range, quantity, US destination and requested timing.
  2. Optional budget, currency, per-unit or whole-order basis, and a high-end, mid-range, budget or undecided preference are read as buyer guidance.
  3. Proposed manufacturers are asked only after the columns are clear enough to compare. You receive questions when a cell is empty.
  4. Datasheet, drawing and listing requests go to the quoting party. This desk does not stamp those files as approved.

Social posts are not a support channel. Use the form, the equipment planner, or the procurement brief if you are still gathering ratings. Product labels live on the inquiry cards.

A lower equipment price may suit a fixed budget when the scope matches; a broader delivered offer may include the freight, connectors or monitoring omitted from that price. State which costs your budget includes. Exact-model documents still need review, engineering approval remains with qualified parties, and a requested delivery date is not a confirmed shipment.

Numbers worth typing if you already have them
BlankHow to write it
rated powerfor example 30 kW, 60 kW or 110 kW
MPPT2, 4, 6 or 12 channels, or unknown
maximum power voltagethe string Vmp you were given, such as 380 V or 720 V
open-circuit voltagecold Voc, such as 490 V or 900 V
string current11 A, 15 A or 22 A per MPPT input
maximum system voltage600 V, 1000 V or 1500 V DC as printed on the study
enclosure ratingthe room or the roof, not a guessed NEMA label
grid-forming inverteryes, no, or not in the study
bidirectional inverteronly when charge power must flow through the same converter
DC-to-AC ratio1.10, 1.30 or 1.45 if someone already calculated it

Procurement form

Describe the inverter application, electrical interfaces, quantity and US delivery point. A budget is optional; include currency and whether it covers one unit or the whole order. You do not need an existing quotation.

Enter the buyer contact name.
Enter a work email.
Enter the buying company.
Describe the specification, quantity, destination and timing.

The note is reviewed as a sourcing request. It does not reserve inventory or approve an interconnection. Read the privacy policy.